Information for Mariners

Briefings for Mariners

Briefings for Mariners are issued to the United States Coast Guard (USCG), the Fishery Liaison, and posted here.

The briefings include details of current operational activities at the wind farm, where we are working, information about the vessels being used, as well as future outlooks. The briefings are issued as needed.

Mariner safety

Ørsted will be performing survey operations along the cable route and within the lease area. During those times, all mariners transiting or fishing in the survey area are requested to provide a wide berth to survey vessels as they will be limited in their ability to maneuver (VRAM) and towing gear out to 300 meters behind the vessel.

Vessels in the vicinity of the survey vessel should operate in a manner that will not endanger the vessel or associated equipment.

Met buoy information

Ørsted has deployed a met-ocean buoy to gather wind resource, metocean, and biological data.

Click here for more information

 

 

Operational wind farms
  • Block Island Wind Farm

    Block Island Wind Farm (BIWF)


    Located approximately 3 miles south east of Block Island, Rhode Island, the Block Island Wind Farm consists of five, six-megawatt offshore wind turbines, a submarine cable connecting the turbines, and a submarine cable from the northernmost turbine to an interconnection point on Block Island. The construction of the five turbines and the transmission cables was completed in 2016. The BIWF team has worked closely with mariners, including commercial and recreational fishing groups, to minimize impacts to the extent possible.

    View the most recent briefing here

    View BIWF chart here

Revenue contracts (secured or soon to be secured)
Wind farms in development

Fishing gear conflict prevention and claim procedure 

 

As good neighbors and fellow ocean users, Ørsted recognizes the possibility of offshore wind activity and commercial fishing gear encounters. We believe that with proper communication and training, there will be limited gear interactions, if any, in connection with the installation and operation of our offshore wind farms. In the event that there is a gear loss caused by or resulting from Ørsted’s activities, we have provided a claim/damage procedure at the link below. The prevention procedures are by no means exhaustive and will continue to be modified and improved.

Click here for more information on claim procedure